Completion date: May 17, 2024
Location: Colorado Springs, CO
The garage door had damaged the bottom, the edge of the house had been pushed in, and there was a crack on the side of the house.
Reconstruction:
General demolition-Doors-Drywall-Framing and rough carpentry-Insulation-Painting-Siding.